Hambantota Port Development Project, Phases 1 and 2, Sri Lanka

Client: Sri Lanka Ports Authority
Contract Sum :
Construction Period: Jan, 2008 — Dec, 2011 (Phase 1); (Phase 2 is In progress)
Main Works: Two 100,000DWT general purpose berths, a 100,000DWT oil berth and a 300m breakwater with 17m deep basin area excavated from land in Phase 1 and Two container berths, two 150,000t multi-purpose berths and an oil terminal in Phase 2.